Yard Work, Post Construction Yard Repair

Get Connected Icon Until Sep 13, 2026
Get Connected Icon 8:30am-4:00pm

Description

1. Help with yard repair, adding top soil and maybe grass seed to low spots due to construction equipment and trucks and workers from a construction project to replace the south house wall. 

2.Re-lay a brick path with Polymer/Polymeric sand and tamping. 

3. Raking the yard, spreading fertilizer and weed killer (10/10/10) and putting down grass seed and mulching or germination cover (potting soil/compost/straw).

4. Planting flowers that will be provided or heirloom plants.
5. Pulling weeds, cutting out saplings or volunteer trees (mulberry and walnut shrub trees)

Location

Get Connected Icon 502 1st St. SW
Waverly, IA  50677